Powered by OpenAIRE graph

IMPRESS

New Easy to Install and Manufacture PRE-Fabricated Modules Supported by a BIM based Integrated Design ProceSS
Funder: European CommissionProject code: 636717 Call for proposal: H2020-EE-2014-1-PPP
Funded under: H2020 | IA Overall Budget: 6,041,470 EURFunder Contribution: 4,493,100 EUR
Description

IMPRESS will develop three different prefabricated panels for buildings: (i) a polyurethane based insulated panel with improved thermal performance and light radiation and (ii) a thin, lightweight pre-cast concrete sandwich panel, with optimum thermal and weathering resistance, both of which are suitable for overcladding; (iii) a lightweight pre-cast concrete sandwich panel incorporating Phase Change Materials (PCM) to adapt the thermo-physical properties of the building envelope and enable optimum passive heating and cooling benefits, suitable for recladding. Innovative nano/micro particle based coatings, suitable for 3D printing, will be also developed to achieve anti-corrosion resistance, high mechanical strength, improved solar reflectance, improved ageing resistance and anti-vandalism properties. To create the panels, an innovative manufacturing process will be created that includes Reconfigurable Moulding (RM) techniques, 3D laser scanning and 3D printed technology. In addition, 3D printed microstructured formworks will be developed as permanent external layer for the polyurethane panel to match the existing building aesthetics and provide solar radiation efficiency. The overall manufacturing process will (i) allow for mass production of panels, which take into account complex architectural and aesthetic issues, (ii) allow for faster production while lowering prefabrication costs and (iii) develop new controlled and cost effective solutions. IMPRESS will also develop a new Iterative Design Methodology, which will incorporate all stages of the Design-Construct-Install-Operate process. This will be integrated with a BIM cloud based database focussing on the interoperability between software tools required for the prefabricated process. Furthermore, new penalty based business models will be investigated. The final result will be demonstrated on two existing buildings where final as-built product performance will be validated against the initial design.

Data Management Plans
Powered by OpenAIRE graph

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

All Research products
arrow_drop_down
<script type="text/javascript">
<!--
document.write('<div id="oa_widget"></div>');
document.write('<script type="text/javascript" src="https://www.openaire.eu/index.php?option=com_openaire&view=widget&format=raw&projectId=corda__h2020::52096e621a72daef32e034e5c805d740&type=result"></script>');
-->
</script>
For further information contact us at helpdesk@openaire.eu

No option selected
arrow_drop_down