Powered by OpenAIRE graph

FONDEN MARSK MC-KINNEY MOLLER CENTER FOR ZERO CARBON SHIPPING

Country: Denmark

FONDEN MARSK MC-KINNEY MOLLER CENTER FOR ZERO CARBON SHIPPING

2 Projects, page 1 of 1
  • Funder: European Commission Project Code: 101138583
    Overall Budget: 8,919,800 EURFunder Contribution: 7,436,450 EUR

    Delays within the maritime supply chain can lead to a “hurry-up-and-wait” syndrome of vessels sailing at a predetermined speed to their destination port to find the terminal or port not ready thus waiting at anchorage in the port area. Updated information about current states are not communicated to all partners in the different port call phases. This makes traffic of vessels waiting, entering, and departing from ports challenging. Communicating terminal or port readiness earlier to vessels allows them to adjust speed and save fuel of up to 23% of the overall voyage including the avoidance of greenhouse gas emissions. The average annual waiting time at anchorage is found to be ca. 9% for wet bulk, ca. 9% for dry bulk, ca. 7% for LPG tankers, ca. 7% for dry breakbulk, ca. 5% for container ships, and ca. 4% for LNG tankers. RoRo-vessels benefit from less traffic-condensed port entries and seaways as well as transparent real-time communication of readiness levels regarding ports and terminals as well as multi-modal hinterland transportation critical for RoRo-port departures. MISSION will develop an interoperable digital real-time-based optimization and decision support tool enabling coordinated port call operations planning and execution in terms of time, fuel consumption, environmental impact, and safety spanning the overall maritime supply chain. Stakeholders benefits from increased transparency and information sharing between shipping companies, terminals, ports, and service providers, enabled to optimize their resource and capacity planning including port’s hinterland modalities in compliance with the Maritime Labor Convention.

    more_vert
  • Funder: European Commission Project Code: 101036594
    Overall Budget: 30,764,400 EURFunder Contribution: 24,964,600 EUR

    The MAGPIE consortium, consisting of 4 ports (Lighthouse Port of Rotterdam, Fellow ports DeltaPort (inland), Port of Sines and HAROPA), 9 research institutes and universities, 32 private companies and 4 other institutes, forms a unique collaboration addressing the missing link between green energy supply and green energy use in port-related transport and the implementation of digitisation, automation, and autonomy to increase transport efficiency. MAGPIE accelerates the introduction of green energy carriers (batteries, hydrogen, ammonia, BioLNG and methanol) combined with realisation of logistic optimisation in ports through automation and autonomous operations. The main objective of MAGPIE is to demonstrate technical, operational, and procedural energy supply and digital solutions in a living lab environment to stimulate green, smart, and integrated multimodal transport and ensure roll out through the European Green Port of the Future Master Plan and dissemination and exploitation activities. A living lab approach is applied in which technological and non-technological innovations are developed or demonstrated. Innovations demonstrated are: On-site BioLNG production; Smart Energy Systems; Shore power peak shaving; Port digital twin (GHG tooling and energy matching); Ammonia bunkering; Offshore charging buoy; Autonomous e-barge and transhipment; Green energy container for inland shipping; Hybrid shunting locomotive; Green connected trucking; Spreading of road traffic; Non-technological innovations to increase the use of green energy. Demonstrators will lead into the Master Plan for the European Green including a roadmap and handbook for implementation. To increase the reach and exploitation of the project results, stakeholders will be in the project through stakeholder consultation groups, targeted communication and dissemination activities. Technical collaborations will be set up with other actions to multiply the results of MAGPIE and of the other actions.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.