Powered by OpenAIRE graph

Alstom Zwuss SP zoo

ALSTOM ZWUS SPOLKA Z OGRANICZONA ODPOWIEDZIALNOSCIA
Country: Poland

Alstom Zwuss SP zoo

2 Projects, page 1 of 1
  • Funder: European Commission Project Code: 881806
    Funder Contribution: 17,800,900 EUR

    X2RAIL-4 is the 4th project of the Shift2Rail members in the IP2 “Advanced Traffic Management & Control Systems” domain and it aims to continue the research and development of key technologies within the following Technology Demonstrators (TDs): -Railway line capacity increase (ATO up to GoA4)–TD2.2 (WP3, WP4, WP5): Finalize the activities started in X2Rail-1 by completing the GoA2 Specification. Develop ATO GoA4 prototypes. Integrate and test Obstacle Detection devices and “environment sensors” in cooperation with IP5 TD5.1.3. -On-Board Train Integrity–TD2.5 (WP6, WP7): Finalize the activities started in X2Rail-2. Define, develop and test complete On-Board Train Integrity system prototypes able to be applied in every train typology (i.e. Passengers and Freight trains with wired and wireless communication). -Traffic Management Evolution–TD2.9 (WP8, WP9, WP10): Finalize the activities started in X2Rail-2. Define, develop and test various elements of a Traffic Management System platform. Define and design a communication platform (Integration Layer) using standardized data structures and processes to manage the Communication/Data exchange between different services/clients and supporting TMS applications connected to other multimodal operational systems. -Smart radio-connected all-in-all wayside objects–TD2.10 (WP11, WP12): Finalize the activities started in X2Rail-1.Develop, implement and validate technical demonstrator. Develop and test prototype providing data exchange between trackside equipment and signalling devices via wireless connection; reduction of required cabling; increase on the availability of Maintenance Data, reduction of maintenance costs; support to preventive maintenance.

    more_vert
  • Funder: European Commission Project Code: 101101973
    Funder Contribution: 37,876,000 EUR

    “MOTIONAL” will enable the improved planning and operational management of services and offers and is therefore of paramount importance to meet the European ambitious target to make rail the preferred mode of transport in the future. It will enable the future European railway system to be interoperable, resilient, able to adapt capacity and able to integrate all involved services including last mile operations, exploiting the opportunities provided by digitalization. The “MOTIONAL” developments for the future European Traffic Management are key to achieve the foreseen Single European Rail Area. Today, rail traffic is managed on national/regional level supported by legacy systems with a poor level of digitalization and weak integration with systems of other actors participating in the overall traffic planning and management process. Through the development of functional requirements, associated specifications and operational or technological solutions and by taking advantage of the potential of digitalization, “MOTIONAL” will pave the way towards the implementation of the future European Rail Traffic Management System to make rail the backbone of a multimodal transport system for passengers and freight. The planned activities to achieve the objectives of Destination 1 are carried out in two major workstreams. Workstream 1 has the three major focus areas, Planning and Operation activities (dealing with the future interactively linked timetable planning and operational traffic management systems) and Integration activities (dealing with railway services to offer door-to-door mobility). Workstream 2 will deliver a set of digital enablers for all Europe’s Rail Destinations (i.e.“transversal”) to support the development of destination-specific digitalization solutions as Digitalization is a fundamental transformational process encompassing the Rail System as a whole.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.