Powered by OpenAIRE graph

AUREL SPA

Country: Italy
4 Projects, page 1 of 1
  • Funder: European Commission Project Code: 295985
    more_vert
  • Funder: European Commission Project Code: 785219
    Overall Budget: 88,000,000 EURFunder Contribution: 88,000,000 EUR

    This proposal describes the third stage of the EC-funded part of the Graphene Flagship. It builds upon the results achieved in the ramp-up phase (2013 - 2016) and the first core project (2016 - 2018), and covers the period April 2018 - March 2020. The progress of the flagship follows the general plans set out in the Framework Partnership Agreement, and the second core project represents an additional step towards higher technology and manufacturing readiness levels. The Flagship is built upon the concept of value chains, one of which is along the axis of materials-components-systems; the ramp-up phase placed substantial resources on the development of materials production technologies, the first core project moved to emphasise components, and the second core project will move further towards integrating components in larger systems. This evolution is manifested, e.g., in the introduction of six market-motivated spearhead projects during the Core 2 project.

    more_vert
  • Funder: European Commission Project Code: 101007229
    Overall Budget: 26,986,100 EURFunder Contribution: 7,797,660 EUR

    YESvGaN targets a new low-cost wide band gap (WBG) power transistor technology for enabling high-efficiency power electronic systems in the field of electromobility, industrial drives, renewable energies and data centers. In many applications requiring power transistors with high voltage and current rating (600…1200V, ~100A), silicon IGBT technology is nowadays used due to cost considerations accepting its lower efficiency compared to WBG solutions. The main objective of YESvGaN is to demonstrate innovative vertical gallium nitride (GaN) power transistors fabricated on a low-cost substrate such as silicon. This so-called vertical membrane architecture combines the superior performance of GaN as WBG power transistor material with the advantages of a vertical architecture regarding current and voltage robustness at a price competitive to silicon IGBTs. To this end, the entire value chain from substrate, epitaxy, process technology, interconnection technology to application in relevant power electronic systems is addressed. YESvGaN clusters the relevant competences along the value chain in a consortium of large companies, SMEs and institutes from seven European countries.

    more_vert
  • Funder: European Commission Project Code: 696656
    Overall Budget: 89,000,000 EURFunder Contribution: 89,000,000 EUR

    This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CSA) under the 7th framework program (2013-2016), while this and the following parts are implemented as Core Projects under the Horizon 2020 framework. The mission of the Graphene Flagship is to take graphene and related layered materials from a state of raw potential to a point where they can revolutionise multiple industries. This will bring a new dimension to future technology – a faster, thinner, stronger, flexible, and broadband revolution. Our program will put Europe firmly at the heart of the process, with a manifold return on the EU investment, both in terms of technological innovation and economic growth. To realise this vision, we have brought together a larger European consortium with about 150 partners in 23 countries. The partners represent academia, research institutes and industries, which work closely together in 15 technical work packages and five supporting work packages covering the entire value chain from materials to components and systems. As time progresses, the centre of gravity of the Flagship moves towards applications, which is reflected in the increasing importance of the higher - system - levels of the value chain. In this first core project the main focus is on components and initial system level tasks. The first core project is divided into 4 divisions, which in turn comprise 3 to 5 work packages on related topics. A fifth, external division acts as a link to the parts of the Flagship that are funded by the member states and associated countries, or by other funding sources. This creates a collaborative framework for the entire Flagship.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.