T&D EUROPE

ASSOCIATION EUROPEENNE DE L'INDUSTRIE DES EQUIPEMENTS ET DES SERVICES DE TRANSMISSION ET DE DISTRIBUTION D'ELECTRICITE AISBL
Country: Belgium
5 Projects, page 1 of 1
  • Funder: European Commission Project Code: 101069656
    Overall Budget: 999,812 EURFunder Contribution: 999,812 EUR

    Power Electronics is enabling radical transformation in the power grid and, in particular, it is opening the opportunity for a massive application of DC technology. DC technology will increase the overall flexibility and efficiency of the infrastructure. Nevertheless, this innovation comes with challenges in terms of interoperability when we consider networks with multi-vendors. The concrete case of off-shore wind farms is then the starting point for the transformation. READY4DC will create the right conditions to establish a community of experts that will discuss all the implications of the process both from a technical and a legal perspective. Thanks to the work of a set of working groups with open participation, position papers will be produced to create the proper conditions for consensus paving the way towards changes in the regulation and in the legal framework. The results of this work will impact not only the off-shore use cases but, in principle, all the application of power electronics driven grids and at every voltage level, determining a very important step towards a futuristic infrastructure in which DC will play a central role at every level.

    more_vert
  • Funder: European Commission Project Code: 282794
    more_vert
  • Funder: European Commission Project Code: 101095874
    Overall Budget: 70,001,296 EURFunder Contribution: 50,720,400 EUR

    To unlock multi-vendor HVDC grids and foster the transition of the European energy sector at large scale, InterOPERA proposes a coordinated approach between a diverse, high-level group of industries at the forefront of RES development and grid management. 4 HVDC vendors, 8 TSOs, 2 wind turbine vendors and 3 wind park developers bring their industrial knowledge and practical abilities to make future HVDC systems mutually compatible and interoperable by design, and to improve the grid forming capabilities of offshore and onshore converters. Foreseen and planned HVDC projects will be analysed to define a demonstrator case study. The resulting system-level design will be usable as a guidance to coordinate offshore network planning. This new way of framing the European grid architecture and topology will ensure forward compatibility for future seamless system expansion. Interoperability of control and protection systems will be de-risked through the execution of all necessary activities concurring to the implementation of a real-time physical demonstrator. Concrete results will be delivered through this practical work: detailed functional specifications for each subsystem, standardised models, simulation platforms and interaction study processes, multi-vendor cooperation agreements. Those frameworks will be generalised into operational and strategic tools available to all European stakeholders for the development of multi-terminal HVDC grids that will enhance offshore wind development and integration. Solutions for multi-vendor project procurement, compliant with existing and future regulations, standards and laws, integrating the technical specifications and interoperability assessment tender stages, will be provided to pave the way to the first real-life projects in Europe. External stakeholders will be involved in two-way consultation workshops to maximise the uptake of InterOPERA’s key exploitable results. Recommendations to grid codes and standards will be issued.

    more_vert
  • Funder: European Commission Project Code: 308908
    more_vert
  • Funder: European Commission Project Code: 691714
    Overall Budget: 42,691,700 EURFunder Contribution: 34,480,900 EUR

    In order to unlock the full potential of Europe’s offshore resources, network infrastructure is urgently required, linking off-shore wind parks and on-shore grids in different countries. HVDC technology is envisaged but the deployment of meshed HVDC offshore grids is currently hindered by the high cost of converter technology, lack of experience with protection systems and fault clearance components and immature international regulations and financial instruments. PROMOTioN will overcome these barriers by development and demonstration of three key technologies, a regulatory and financial framework and an offshore grid deployment plan for 2020 and beyond. A first key technology is presented by Diode Rectifier offshore converter. This concept is ground breaking as it challenges the need for complex, bulky and expensive converters, reducing significantly investment and maintenance cost and increasing availability. A fully rated compact diode rectifier converter will be connected to an existing wind farm. The second key technology is an HVDC grid protection system which will be developed and demonstrated utilising multi-vendor methods within the full scale Multi-Terminal Test Environment. The multi-vendor approach will allow DC grid protection to become a “plug-and-play” solution. The third technology pathway will first time demonstrate performance of existing HVDC circuit breaker prototypes to provide confidence and demonstrate technology readiness of this crucial network component. The additional pathway will develop the international regulatory and financial framework, essential for funding, deployment and operation of meshed offshore HVDC grids. With 35 partners PROMOTioN is ambitious in its scope and advances crucial HVDC grid technologies from medium to high TRL. Consortium includes all major HVDC and wind turbine manufacturers, TSO’s linked to the North Sea, offshore wind developers, leading academia and consulting companies.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.