Powered by OpenAIRE graph

ROBSONS INTERNATIONAL RAIL CONSULTANCY

ROBSON MICHAEL ALAN
Country: United Kingdom

ROBSONS INTERNATIONAL RAIL CONSULTANCY

1 Projects, page 1 of 1
  • Funder: European Commission Project Code: 636285
    Overall Budget: 3,924,800 EURFunder Contribution: 2,997,000 EUR

    The project provides solutions for common infrastructure problems encountered in diverse regions of Europe, e.g. deterioration and scour damage to bridges, slope instability, damage to switches and crossings and track performance. Whilst similar failure modes are seen around the EU, the triggers (precipitation, earthquake loading etc.) are regional. The DESTination RAIL project will develop management tools based on scientific principles for risk assessment using real performance measurements and other vital data stored in an Information Management System. This will allow for a step-change in the management of European rail infrastructure. The objectives will be achieved through a holistic management tool based on the FACT (Find, Analyse, Classify, Treat) principle. Find - Improved techniques for the assessment of existing assets will be developed. Analyse- Advanced probabilistic models fed by performance statistics and using databases controlled by an information management system. Classify- The performance models will allow a step-change in risk assessment, moving from the current subjective (qualitative) basis to become fundamentally based on quantifiable data. Treat - The impact of proposed remediation or reconstruction will be assessed using the a probabilistic whole life cycle model which includes financial and environmental costs and the impact of work on traffic flow. The FACT principles will be implemented in a holistic decision support tool for infrastructure managers. DESTination RAIL will result significant impact in relation to the objectives of the work programme. It will reduce the cost of investment by using the IMS to manage the network, (ii) Monitoring and real-times analyses will prevent unnecessary line restrictions and closures. (iii) Lower maintenance costs by optimisimg interventions in the life cycle of the asset and (iv) optimise traffic flow in the network.

    more_vert

Do the share buttons not appear? Please make sure, any blocking addon is disabled, and then reload the page.

Content report
No reports available
Funder report
No option selected
arrow_drop_down

Do you wish to download a CSV file? Note that this process may take a while.

There was an error in csv downloading. Please try again later.